When a dual-living property comes with unapproved building work
A family bought an extensively renovated property with a detached secondary dwelling, then discovered that the work required connected building, planning, setback and plumbing pathways.
Building certification case studies
These examples explain the types of certification and approval problems QRBS works with. Details are generalised for privacy and do not promise the same outcome for another property.
Detailed anonymised case studies
A family bought an extensively renovated property with a detached secondary dwelling, then discovered that the work required connected building, planning, setback and plumbing pathways.
A specialist survey located the sewer main and exposed a Build Over Asset issue, but an inaccessible inspection point meant the required house connection branch was not fully traced.
A property owner arranged an engineer directly for an as-constructed secondary dwelling. The inspection did not produce the expected certificate and was followed by a much broader and more expensive proposal.
An existing shed used as a secondary dwelling and a proposed carport created connected classification, setback and fire-separation issues. QRBS coordinated both structures through one approval strategy.
A completed secondary dwelling had no clear building approval or final certificate. QRBS coordinated the as-constructed plans, technical evidence and retrospective certification pathway.
A converted-and-extended garage needed structural, survey, glazing, stormwater and historical termite evidence before the private certifier could complete the final assessment.
One property was already under contract when a missing final certificate exposed a complex mismatch between a historic approval, later title reconfiguration and the current addresses.
A residential property involved dwelling additions, plumbing work and several Class 10 structures. QRBS separated the issues and coordinated the evidence, consultants and applications required for staged assessment.
Other common situations
The owner discovered an old approval in the records but no final certificate. The original history and inspection evidence were incomplete.
The pathway required retrieving approval documents, mapping missing evidence and coordinating the appropriate certification and inspection steps.
Council records did not reflect the current layout and the new owner had little reliable information about when the work was completed.
The first steps were a focused document review, accurate as-constructed plans and identification of the structural and certification evidence likely to be needed.
The owner needed to understand which items might be exempt, which required approval and what information council was requesting.
The structures were separated into individual issues, records and photographs were reviewed, and a staged consultant and approval strategy was developed.
The seller believed the property records were in order, but the buyer requested final certification for a patio, conversion and ancillary structure. The owner was worried the sale and settlement might not proceed.
The request was separated into the individual structures and records, then the missing certification evidence and likely consultant inputs were prioritised.